Concrete Estimate Calculator

Estimate concrete costs from slab area, thickness, cost per cubic yard, removal, reinforcement, and your minimum order.

Replace the example inputs with site measurements and your own rates. Use the estimate to plan the cost and verify the slab design and supplier quantities before ordering.

Free to calculate. No account required.

Calculate your job

Calculate an itemized starting price

Example inputs are for demonstrating the formula. Replace them with your measurements and business rates before using the result.

Your calculation

Amounts below use only the values entered on this page. They do not include tax, discounts, or a deposit.

Concrete
$864.20
Removal and disposal
$0.00
Rebar reinforcement
$160.00
Estimated total
$1,024.20

Opens the generator with your itemized amounts filled in. Add the customer details and review the draft before downloading or printing.

How to use this calculation

The measured scope and your own costs matter more than a generic advertised price.

Measure only the area you will pour

Measure slab dimensions in feet and multiply length by width. For a walkway with bends or a patio with steps, divide the plan into shapes you can measure and sum the areas that share a thickness. Omit areas that will remain unpoured. When a slab has thickened edges, footings, or areas with a different depth, calculate those volumes separately and include them in the supplier order and the estimate.

Convert inches of thickness to cubic yards

Divide the slab thickness in inches by 12 to get feet, multiply by area in square feet to get cubic feet, and divide by 27 for cubic yards. A 400-square-foot slab at four inches comes to about 4.94 cubic yards before waste. The calculator uses the unrounded volume for the concrete line and rounds its dollar amount to cents. Thickness is an input from your project design, so confirm it before relying on the price.

Use a rate for the specified mix

Ask your supplier for the price per cubic yard for the mix and delivery date in your scope. Check short-load charges, delivery zones, waiting time, pumping, and whether the quoted rate covers those charges. Enter the confirmed unit rate and add separately priced work in the final estimate. Allowance for spillage, uneven grade, and supplier order increments also belongs in your order planning and should be clearly documented if it changes the billable quantity.

Keep removal and reinforcement visible

Estimate demolition, loading, hauling, and disposal as one removal allowance so the customer can see how much of the job is existing-slab work. For reinforcement, use the specified bar schedule, including overlaps, supports, and installation costs if you include them. Check what the concrete unit price already covers before entering those allowances. Excavation, base preparation, forming, and finishing can be separate lines on the estimate.

Check what your minimum covers

The calculator compares the concrete, removal, and reinforcement subtotal with the minimum order charge and adds the difference if needed. If the supplier applies a minimum to the delivery alone, account for that shortfall in the concrete price or as a separate fee in the document. When the minimum applies to the whole job, keep the adjustment visible so the customer can see how the estimate changes on a small pour.

Review the estimate with site details

Transfer the starting total and describe the slab dimensions, mix, thickness, and what site preparation you included. Identify access constraints, delivery and pour schedules, and who handles permits or inspection if applicable. Call out separate items such as pumping, finish upgrades, or work discovered after removal. Give the customer a way to confirm the assumptions and revise the estimate when the site or material order changes.

Check before you send the price

  • • Verify dimensions, thickness changes, mix, and reinforcement against the project design.
  • • Confirm order increments, delivery fees, waste allowance, and short-load terms.
  • • State whether base preparation, forming, finishing, and disposal are included.

Frequently asked questions

How do I calculate cubic yards for a slab?

Multiply the area in square feet by the thickness in inches divided by 12, then divide by 27. A 400-square-foot slab at four inches is approximately 4.94 cubic yards.

Does the calculator add extra concrete for waste?

It uses the exact entered dimensions. Confirm waste, grade variation, and supplier order increments separately and include any allowance in the final estimate.

Can I enter different slab thicknesses?

Calculate each section separately and sum their concrete costs. Combine any removal, rebar, and minimum adjustments only where those charges apply.

Where do I enter demolition and steel reinforcement?

Use the separate dollar fields for removal and disposal and for rebar reinforcement. Include labor in those amounts if it is part of your allowance.

When is the minimum order charge applied?

It applies when concrete plus removal plus rebar is below the minimum you entered. The result shows the difference as an adjustment.